Centro Over The Halfway Mark Of Construction
Centro in Downtown Miami is over the halfway mark with construction at the 21st floor of the 36 story tower. When we last checked in, the building was at the 4th floor.
The building at 96 NE 2nd Ave, will not have any parking spaces, but residents are encouraged to use the public transportation that is in close proximately such as, the metromover, metrorail and Citibikes.
Construction is expected to be completed in 2015.