A Look At The Paraiso Complex - Photos & Video
The 11 acre Paraiso Complex in Edgewater is growing taller as the four buildings - Paraiso Bay, Gran Paraiso, One Paraiso and Paraiso Bayviews continue to top out.
The 55 story Paraiso Bay topped out in July 2016 and is expected to be completed by this Summer. The 53 story One Paraiso is about to top off and will be completed by the end of the year. Gran Paraiso should top off in the next 3 - 5 months and will be complete by Spring 2018. Gran Paraiso will have 8 bay homes at the base of the building. The last tower, the 44 story Paraiso Bayviews is also close to topping off and will be completed by the end of the year. In total over 1,300 residential units will be delivered to buyers.
Also under construction is the Meyer Davis designed Paraiso Beach Club, which will have a Michael Schwartz Restaurant on the first floor and private residents club on the second floor with a pool.
Previous construction photos of the Paraiso Complex can be viewed here.