Work Begins At Elysee Site
Work has started at the Elysee site in Edgewater with construction on the sea wall. The actual groundbreaking is expected to begin second quarter of this year.
Elysee is being developed by Two Roads Development who are also developing the nearly completed Biscayne Beach in Edgewater and is being designed by Arquitectonica. The building will rise 57 stories at 644 feet and have 100 residential units with only 1 or 2 units per floor. Jean-Louis Denoit is doing the interior designs.