Brickell Flatiron Reaches 15th Floor Of Construction
Brickell Flatiron has reached the 15th floor of construction as it quickly approaches the club levels on the 17th and 18th floors.
Designed by Luis Revuelta and developed by CMC Group, the 64 story Brickell Flatiron broke ground in March 2016 and is expected to be completed by Summer 2019.
Previous construction photos of Brickell Flatiron can be viewed here.