Brickell Flatiron Reaches 46th Floor Of Construction (Photos & Video)
Brickell Flatiron continues to rise quickly as it gets closer to the the 64 floor top off.
Last month, construction reached the 42nd floor as the pace moves at a floor per week with top off anticipated by November/December of this year. A year ago, construction reached the 10th floor.
Previous construction photos and videos of Brickell Flatiron can be viewed here.