The Estates At Acqualina South Tower Reaches 36th Floor Of Construction
The Estates At Acqualina continues to rise quickly as the South Tower reaches the 36th floor of construction. At the end of July construction was on the 23rd floor and the first glass was being installed on the building.
The North Tower had its foundation pour at the end of August and is now starting to go vertical and eventually reach 50 stories and 700 feet.
Previous construction photos of The Estates at Acqualina can be viewed here.