When we last looked at the under construction One Thousand Museum on 1000 Biscayne Boulevard, the building was on the 31st floor. Construction has now reached the 38th floor of the 62 story tower.
A year ago, the base of the building was starting to take shape on the Pritzker Prize winning architect Zaha Hadid designed tower.
One of the unique features of One Thousand Museum is the exoskeleton, which supports the building. The exoskeleton is made of over 3,000 pieces of glass fiber reinforced concrete, which is made in Dubai and shipped to Miami every week. The panels are clamped around the steel rebar and poured with concrete to the give the exoskeleton a continuous flow.
One Thousand Museum is expected to top off before the end of the year and be completed in 2018.
Previous construction photos of One Thousand Museum since the beginning of construction can be viewed here.