Avant At Met Square Tops Off

Avant At Met Square Topped Off

The 43 story Avant At Met Square has topped out in Downtown Miami.

Construction began August 2015 and is expected to be completed first quarter 2018.

The windows are almost installed and painting has begun on the exterior of the building.

Previous construction photos of Avant at Met Square can be viewed here.