The glass is now being installed on the lower floors of Eighty Seven Park as construction reaches the 14th floor of the 18 story luxury condominium in Surfside.
With only 64 residential units, Eighty Seven Park reached the 9th floor just early last month and should top off sometime in August.
Construction started going vertical in March of this year.
The Renzo Piano designed building is expected to be completed in early 2019.