Phase two of Cocowalk renovations are well underway as One Cocowalk reaches the third floor of construction before finally topping off at 5 stories.
Just two months ago, a crane was installed on the site and vertical construction was beginning.
A 7,500 square foot Los Generales Mezcal & Grill will be opening at the end of the year with a rooftop terrace and bar.
The completed Cocowalk will be finished first quarter 2020.
Previous construction photos of One Cocowalk can be viewed here.