Construction has now started on the $800 million Miami Signature Bridge, which includes a redesign of I-395.
The Signature Bridge will have six arches with lighted LED’s designed by Archer Western and The de Moya Group that was chosen in May 2017.
Construction is expected to be completed in the Fall of 2023.