OMA

One Park Grove To Open Soon

One Park Grove

One Park Grove

The last tower at the 5.2 acre Park Grove complex, One Park Grove, is almost completed as residents will start to move in soon.

With 64 residential units, One Park Grove was built on the site of the demolished Coconut Grove Bank.

Previous construction photos of One Park Grove can be viewed here.

One Park Grove Near Completion

One Park Grove

One Park Grove

One Park Grove is getting closer to completion as the finishing touches are being put on the last and final tower at Park Grove.

The landscaping around the building is almost completed while the rooftop pool should be done in the next month or so.

The 24 story tower topped off in March 2019. One Park Grove was built on the site of the old Coconut Grove Bank, which was demolished in August 2017.

Previous One Park Grove construction photos can be viewed here.

One Park Grove Construction Photos

One Park Grove Construction

One Park Grove Construction

One Park Grove is preparing for a Spring 2020 opening as construction on the tower progresses.

When we last looked in July, the last crane was removed from the site. A year ago, construction reached the 15th floor.

One Park Grove is being built on the site of the former Coconut Grove Bank.

Previous construction photos of One Park Grove can be viewed here.

Last Crane Removed From One Park Grove

One Park Grove Construction

One Park Grove Construction

One Park Grove is getting closer to completion has the final crane has been removed from the 21 story building as the last building in the Park Grove complex in Coconut Grove.

Construction began on One Park Grove March 2018 before topping off in March of this year. The tower is expected to be completed before the end of the year.

Previous construction photos of One Park Grove can be viewed here.

One Park Grove Construction Photos

The Three Towers of Park Grove

The Three Towers of Park Grove

The last, and final tower at Park Grove, One Park Grove is taking shape since it topped off at the beginning of March.

One of the cranes has been removed from the building and the final crane will probably be taken down in the next month or so.

Construction started on One Park Grove in March 2018 after the Coconut Grove Bank was demolished in October 2017.

The OMA designed Park Grove should be completed by the end of 2019.

Previous construction photos of One Park Grove can be viewed here.

One Park Grove Tops Off

One Park Grove

One Park Grove

The Rem Koolhaas and Shohei Shigematsu of OMA designed One Park Grove has topped off in Coconut Grove at 24 stories. When we last looked at the project in December, the building was on the 15th floor.

One Park Grove is the last tower in the 5.2 acre Park Grove complex. The other towers, the Club Residences and Two Park Grove opened in the Fall 2018.

One Park Grove is being built on the site of the old Coconut Grove Bank building and is expected to be completed before the end of 2019.

Previous construction photos of One Park Grove can be viewed here.

One Park Grove Reaches 15th Floor Of Construction

One Park Grove Reaches 15th Floor

One Park Grove Reaches 15th Floor

After reaching the 8th floor at the end of October, construction has now reached the 15th floor at One Park Grove in Coconut Grove.

One Park Grove will have only 64 residential units and top off at 20 stories. One Park Grove is the last tower to be built in the 5.2 acre Park Grove complex along with Two Park Grove and the Club Residences. The tower is being built on the site of the former Coconut Grove Bank building.

Park Grove was designed by Rem Koolhaas and Shohei Shigematsu of OMA and is expected to be completed in 2019.

Previous construction photos of Park Grove can be viewed here.