Construction

Foundation Pour At Melo Group's Downtown 5th As Construction Underway

Downtown 5th Construction

Downtown 5th Construction

The foundation has been poured on the East Tower at Downtown 5th in Downtown Miami.

There will be a West and East tower both at 53 stories and 495 feet with a combined 1,042 rental units.

Renderings for Downtown 5th can be viewed here.

TBT - Zaha Hadid's One Thousand Museum Tops Off

One Thousand Museum at The Top

One Thousand Museum at The Top

TBT (February 5, 2018) - Two years ago One Thousand Museum topped off at 709 feet in Downtown Miami. The building eventually received TCO in July 2019. Previous construction photos of One Thousand Museum can be viewed here.

One Thousand Museum has topped off at a height of 709 feet in Miami and is taller than its neighboring buildings.

The Zaha Hadid designed building with exoskeleton is expected to be completed by the end of 2018.

Previous construction photos of One Thousand Museum can be viewed here.

830 Brickell Office Tower Going Vertical

830 Brickell Construction

The 724 foot office tower 830 Brickell is starting to go vertical, according to The Miami Herald.

830 Brickell is being developed by OKO Group and Cain International and will be the second tallest office tower in Miami after the Southeast Financial Center when it is completed in 2021.

Demolition began at the site two years ago in January 2018 with foundation work beginning in March 2019.

Previous photos of 830 Brickell can be viewed here.

Society Biscayne Goes Vertical As Construction Reaches 3rd Floor

Society Biscayne Construction

Society Biscayne Construction

Society Biscayne, formerly known as 400 Biscayne, has reached the 3rd floor of the 49 story tower in Downtown Miami.

The building will have 649 rental units and a furniture design team that will create pieces for the common areas and furniture for the units.

Society Biscayne is expected to be completed in 2021.

Previous construction photos of Society Biscayne can be viewed here.

Aston Martin Residences Reaches 8th Floor Of Construction

Aston Martin Residences Construction

Aston Martin Residences Construction

The 66 story Aston Martin Residences in Downtown Miami has reached the 8th floor of construction.

In March 2019, excavation work was still being done on the site and reaching the 2nd floor in October 2019.

Previous construction photos of the Aston Martin Residences can be viewed here.

TBT - Rise Brickell City Centre Tops Off Today

Rise Brickell City Centre

TBT (January 30, 2015) - 5 years ago today Rise Brickell City Centre topped off. Brickell City Centre would be completed in the Fall of 2016.

Since The East Hotel topped off in December, Rise Brickell City Centre is the second of the three towers to top off.

The 390 unit residential condo will have units that vary from 980 square feet to 3,200 square feet.

The balconies and windows are being installed on the lower portion of the condo.

Reach Brickell City Centre will be next condo to top off and that should happen by the end of February.

More photos of Brickell City Centre can be seen here.

Grand Station Miami Reaches 8th Floor of Construction

Grand Station Miami Construction

Grand Station Miami Construction

After beginning construction in October 2019, the 31 story Grand Station Miami has now reached the 8th floor.

The building will have 300 apartment units with 44 studios, 124 one bedroom units and 132 two bedroom units.

Previous construction photos of Grand Station Miami can be viewed here.