The Miami Herald is reporting that the PortMiami Tunnel will be ready to open after two months in delays and $7 million in fines.
The tunnel was supposed to be ready a fews day after the tunnel dedication ceremony, but problems with the ventilation system and leaky pipes were the cause for the delay.