When we last looked at SLS Lux in January, construction was on the 10th floor. Now in June, the 58 story tower is on the 33rd floor and just pass the halfway point of topping out.
Just a little over a year ago, SLS Lux was just about to do a foundation pour at the site.
Construction has started to go vertical on the amenities portion of the South side of the tower where the lap pool, cabanas and tennis court will be. Previously, this was the location of the sales center was recently torn down.
Previous construction photos can be viewed here.