TBT (June 5, 2015) - An aerial video of Brickell and Brickell Key 4 years ago and in that short time the skyline of Miami has changed. Brickell City Centre was under construction and construction was just starting on Brickell Heights, SLS Lux Brickell and Panorama Tower.
Miami
One Cocowalk Construction Updates
One Cocowalk Construction
The 5 story Class A Office building One Cocowalk is getting taller as construction is being done on the final floor.
Cocowalk was completely demolished September 2018 and started going vertical December 2018.
One Cocowalk is scheduled to open first quarter 2020.
Previous demolition and construction photos of One Cocowalk can be viewed here.
Edgewater Site Sold For $13.65M
2927 NE 4th Ave
A 50,750 square foot site located at 2927 NE 4th Ave in Edgewater has sold for $13.65 million, according to The Real Deal.
The lots were purchased by DLC Capital Management and sold by AR Edgewater Investments.
The site can be zoned for 36 stories.
The Carlos Zapata Designed Turnberry Ocean Club Residences Rising Quickly In Sunny Isles Beach
Turnberry Ocean Club Residences
Turnberry Ocean Club Residences is getting taller every month as it rises next to the Porsche Design Tower in Sunny Isles Beach.
Two months ago, construction was on the 37th floor. The 54 story tower is getting closer to top off.
The Carlos Zapata designed building is being developed by Turnberry Associates.
Previous construction photos of Turnberry Ocean Club Residences can be viewed here.
TBT - Biscayne Beach Construction Photos
TBT (May 27, 2015) - Biscayne Beach was under construction in Edgewater. Biscayne Beach topped off in May 2016 and was eventually completed April 2017.
Biscayne Beach in Edgewater is starting to take form after starting construction over a year ago.
According to The Next Miami, over 95% of the units have been sold in condo.
The condo is located on the edge of Biscayne Bay across from the under construction Paraiso Bay from Related Group.
Virgin MiamiCentral Offices Sold For $159M


Florida East Coast Industries has sold the office buildings 3 MiamiCentral and 2 MiamiCentral for $159 million to Shorenstein, according to The Real Deal.
3 MiamiCentral was completed December 2017 and has 90,000 square feet of office space and 35,000 square feet of retail. 2 MiamiCentral, which was completed last year has 190,000 square feet of office space.
Elysee Reaches 34th Floor Of Construction
Elysee Construction
The 57 story Elysee in Edgewater has reached the 34th floor of construction as it gets closer to top off. Construction has reached the point in the building where it now extends further out and will extend further out once it reaches the 45th floor.
Elysee started going vertical June 2018 and should top off before the end of the year.
The parking garage also continues to get taller since it started going vertical in March.
Previous construction photos of Elysee can be viewed here.