Aria on the Bay is growing taller and has reached the 35th floor of the the 53 story condo. When we last looked at the project in August, Aria on the Bay was at the 20th floor.
The flowing curves of the tower are very visible on the Arquitectonica designed building. The balconies are now being installed on the first 6 floors, while the windows are continuing to be installed higher up.
Aria on the Bay is being developed by Melo Group and is expected to be completed in 2017.
Previous construction photos of Aria on the Bay from the beginning can be viewed here.