Elysee Reaches 45th Floor Of Construction

Elysee Construction

Elysee Construction

The 57 story Elysee tower in Edgewater is getting closer to topping off as construction reaches the 45th floor. In May, construction reached the 34th floor.

In June 2018, construction started going vertical on the building after the foundation pour.

Previous construction photos of Elysee can be viewed here.