Condo

Construction Reaches 3rd Floor at YotelPad Miami

YotelPad Miami Construction

Construction has started at the 31 story, 341 foot YotelPad Miami which will have 231 residential units and 222 hotel rooms.

YotelPad is being designed by Stantec and developed by Aria Development Group and Kuwait’s Aqarat.

Units range from 417 to 708 square feet and is expected to be completed in 2021.

TBT - Centro Construction Photos

Centro Construction Site

Centro Construction Site

TBT (October 13, 2014) - 5 years ago the 36 story condo Centro was under construction and on the 4th floor. Centro eventually opened in May 2016 in Downtown Miami.

Since our last update in July, Centro is rising vertically in Downtown Miami. Workers are starting on the 4th floor of the 36 story tower.

Centro will not have a parking garage, but residents will have advantage of close proximity to the metrorail, metromover and the use of the CitiBikes that are coming to Downtown next month.

TBT - A Look At The Under Construction FENDI Chateau Residences In Surfside

TBT - A Look At The Under Construction FENDI Chateau Residences In Surfside

Another luxury condo under construction in Surfside is FENDI Chateau Residences, which is already topped out at 12 stories and will have 58 residential units. Resident units range from 3,325 to 7,000 square feet with 10 foot ceilings. There are also 3 penthouse units with private swimming pools and sundecks.

Read More

Twin 60 Story Towers Called Island Bay Proposed In Edgewater

Island Bay Rendering

Island Bay Rendering

Two twin 60 story towers called Island Bay located at 700 NE 24th St in Edgewater have been proposed.

The towers rising 648 feet will be developed by Melo Group and designed by Arquitectonica with 783 residential units.

Island Bay is located next to Biscayne Bay and the under construction Elysee, also designed by Arquitectonica.

There will be a 50 foot set back from the water to create a public walking space along the bay.

TBT - Construction Photos Of The Surf Club - Four Seasons Hotel & Private Residences

TBT - Construction Photos Of The Surf Club - Four Seasons Hotel & Private Residences

Construction is moving quickly at The Surf Club - Four Seasons Hotel & Private Residences in Surfside located at 9011 Collins Avenue. Since we last looked three months ago, one crane has been removed and the windows are being installed on the North Tower. 

Read More

The 66 Story Aston Martin Residences Now Going Vertical As Construction Reaches 2nd Floor

Aston Martin Residences Construction

Aston Martin Residences Construction

The 66 story Aston Martin Residences in Downtown Miami along the Miami River is now going vertical as construction reaches the 2nd floor.

Foundation work began November 2017 and two cranes were installed on the site in February of this year.

With 391 residential units, prices start at $750,000 with the triple level penthouse going for $50 million.

The Aston Martin Residences is being developed by G&G Business Developments and designed by Revuelta Architecture and Bodas Miani Anger Architects & Associates.

Construction is expected to be completed in 2022.

36 Story Tower Planned For Overtown

Block 45 Rendering

A 36 story tower, called Block 45, located at 152 NW 8th Street in Overtown has been proposed, according to Miami Today.

Block 45 would have 616 residential units with 98 of them being micro-units. It would have 25,000 square feet of retail space with 637 parking spaces.

The project is being developed by Atlantic Pacific Communities LLC and designed by Bermello Adjamil.

Block 45 would be located next to 3 MiamiCentral which was just sold in May for $159 million.

Miami’s Urban Development Review Board approved the project on September 18.