Golden Dusk Photography

TBT - Rise Brickell City Centre Tops Off Today

Rise Brickell City Centre

TBT (January 30, 2015) - 5 years ago today Rise Brickell City Centre topped off. Brickell City Centre would be completed in the Fall of 2016.

Since The East Hotel topped off in December, Rise Brickell City Centre is the second of the three towers to top off.

The 390 unit residential condo will have units that vary from 980 square feet to 3,200 square feet.

The balconies and windows are being installed on the lower portion of the condo.

Reach Brickell City Centre will be next condo to top off and that should happen by the end of February.

More photos of Brickell City Centre can be seen here.

Luma Miami Worldcenter Reaches 12th Floor Of Construction

Luma Miami Worldcenter Construction

Luma Miami Worldcenter Construction

The 43 Story Luma Miami Worldcenter has reached the 12th floor of construction after starting to go vertical in September 2019.

Luma Miami Worldcenter will have 434 apartment units and rise 493 feet.

The parking garage on the West side of the building is also currently going vertical.

Previous construction photos of Luma Miami Worldcenter can be viewed here.

TBT - The Under Construction Square Station Is Taking Shape Quickly

Square Station in Arts & Entertainment District

Square Station in Arts & Entertainment District

TBT (January 24, 2018) - 2 years ago the two 34 story Square Station towers were under construction and soon to open. The building eventually opened in June 2018.

Melo Group also completed the next door Art Plaza in June 2019 and currently have the topped off Miami Plaza under construction.

Going up very quickly is the under construction Square Station in the Arts and Entertainment district of Miami.

The jagged lines of the façade of the two 34 towers of more apparent without the cranes.

With 710 rental units, construction began October 2016 and topped off in September 2017. 

Square Station is being developed by Melo Group who also have the soon to open Aria on the Bay and the under construction Art Plaza across the street.

Previous construction photos of Square Station can be viewed here.

First Glass Installed At 2000 Ocean As Construction Reaches 20th Floor

2000 Ocean Construction

2000 Ocean Construction

The 38 story 2000 Ocean in Hallandale Beach is rising quickly as construction reaches the 20th floor.

The first glass has been installed on the lower floor of the building.

2000 Ocean is expected to be completed in next year in Spring 2021.

Previous construction photos of 2000 Ocean can be viewed here.

The Estates At Acqualina Reaches 47th Floor Of Construction

The Estates At Acqualina Construction

The Estates At Acqualina Construction

The Estates At Acqualina South Tower is 3 floors away from top off as construction reaches the 47th floor and a height of 646 feet.

The North Tower has reaches the 5th floor and will eventually rise 50 stories and slightly taller at 667 feet.

Previous construction photos of The Estates At Acqualina can be viewed here.

AMLI Residential Midtown Miami Getting Closer To Completion

AMLI Residential Midtown Miami

AMLI Residential Midtown Miami

The 6.6 acre AMLI Residential Midtown Miami is getting closer to completion as all the cranes have been removed from the site since we last looked in September 2019.

With over 700 rental units, the North Tower is 12 stories and the South Tower is 8 stories. Construction started going vertical October 2018.

Previous construction photos can be viewed here.

AC Hotel Miami Midtown Completed

AC Hotel Miami Midtown

AC Hotel Miami Midtown

The 7 story AC Hotel Miami Midtown located at 3400 Biscayne Boulevard has been completed.

The Kobi Karp designed 153 room hotel with a rooftop pool, bar, restaurant and meeting rooms topped off a year ago.

Previous construction photos of the AC Hotel Miami Midtown can be viewed here.