Architecture

57 Story Elysee Construction Photos

Elysee Construction

Elysee Construction

The 57 story Elysee tower is taking shape in Edgewater since the building topped off at the beginning of the year.

A year ago, construction reached the 34th floor. The crane has been removed from the building and the parking garage has been connected to the base of the tower. Work is being doing on the pool deck above the garage.

The telescoping building is expected to be completed by the end of the year.

Previous construction photos of Elysee can be viewed here.

Washington Squared Hotel Construction Updates

Washington Squared Construction

Washington Squared Construction

The Morris Adjmi designed 7 story Washington Squared Hotel is taking shape and getting closer to completion since we last looked February 2019 when the building topped.

The hotel will have 312 hotel rooms with 46,849 square feet of retail.

Washington Squared Hotel started going vertical August 2018 after being acquired for $32.75 million in 2014 and 2015.

One Cocowalk Almost Completed - Set To Open Summer 2020

One Cocowalk in Coconut Grove

One Cocowalk in Coconut Grove

One Cocowalk is scheduled to open Summer 2020 as the final shape of the new 5 story Class A office building stands out on the streets of Coconut Grove.

Just over a year ago, construction reached the 3rd floor as the building started going vertical December 2018. Demolition on the old Cocowalk began May 2018 before being completed demolished September 2018.

Previous One Cocowalk Construction photos can be viewed here.

One Park Grove Near Completion

One Park Grove

One Park Grove

One Park Grove is getting closer to completion as the finishing touches are being put on the last and final tower at Park Grove.

The landscaping around the building is almost completed while the rooftop pool should be done in the next month or so.

The 24 story tower topped off in March 2019. One Park Grove was built on the site of the old Coconut Grove Bank, which was demolished in August 2017.

Previous One Park Grove construction photos can be viewed here.

The Estates at Acqualina South Tower About To Top Off

The Estates at Acqualina South Tower

The Estates at Acqualina South Tower

The Estates at Acqualina South Tower has reached the 49th floor and about to top off at 50 stories.

The North Tower has reached the 17th floor before it will eventually top off at 50 stories and 667 feet.

Previous construction photos of The Estates at Acqualina can be viewed here.

Grand Station Miami Reaches 15th Floor Of Construction

Grand Station Miami Construction

Grand Station Miami Construction

Grand Station Miami is rising quickly in Downtown Miami as construction is at the halfway mark on the 30 story building with 300 apartments.

Construction started going vertical on the building in October 2019.

Grand Station Miami is being developed by Rovr Development with the Miami Parking Authority.

Previous construction photos of Grand Station Miami can be viewed here.

Luma Miami Worldcenter Reaches 16th Floor Of Construction

Luma Miami Worldcenter Construction

Luma Miami Worldcenter Construction

Luma Miami Worldcenter is rising quickly to reach the 16th floor since we last looked at the project in January.

The 43 story building is starting to take shape after starting to go vertical in September 2019.

Luma Miami Worldcenter will have 434 apartments and is being developed by ZOM Living and Moinian Group. The tower was designed by Stantec.

Previous construction photos of Luma Miami Worldcenter can be viewed here.