The 30 story Grand Station has topped off in Downtown Miami.
Foundation began October 2019 and is expected to be competed before the end of the year.
Previous construction photos of Grand Station can be viewed here.
The 30 story Grand Station has topped off in Downtown Miami.
Foundation began October 2019 and is expected to be competed before the end of the year.
Previous construction photos of Grand Station can be viewed here.
Located across the street from Brickell City Centre, the 24 story AC Hotel By Marriott and Element By Westin continues to rise as it reaches the 14th floor.
The building will have 264 hotel rooms, 23,000 square feet of ground level retail and a rooftop bar.
Previous construction photos of the AC Hotel By Marriott and Element By Westin can be viewed here.
The 49 story Society Biscayne, located at 400 Biscayne Boulevard has reached the 16th floor of construction.
Groundbreaking on the Sieger Suarez designed building began June 2019 and is expected to be completed Fall 2021.
Society Biscayne will have 649 rental units.
Previous construction photos of Society Biscayne can be viewed here.
The Estates at Acqualina South Tower had its official topping off on Friday, July 3rd as the building reached 50 stories and 646 feet.
The North Tower has reached the 29th floor and will also top off at 50 stories, but will be slightly taller at 667 feet.
Previous construction photos of The Estates at Acqualina can be viewed here.
The 43 story Luma Miami Worldcenter is getting closer to top off as it reaches the 29th floor of construction.
Two months ago, construction was reached the 22nd floor.
Luma Miami Worldcenter will have 434 rental units and is located next to the under construction CitizenM Miami Worldcenter and in front of Caoba Miami Worldcenter.
Previous construction photos of Luma Miami Worldcenter can be viewed here.
CitizenM Miami Worldcenter has reached the 7th floor of construction before it tops off at 12 stories. At the beginning of May, the building was starting to go vertical.
The hotel will have 351 rooms and will be completed next year.
Previous construction photos of CitizenM Miami Worldcenter can be viewed here.
The first glass has been installed at Downtown 5th in Downtown Miami as the East Tower reaches the 25th floor and the West Tower reaches the 11th floor.
The foundation pour started on the East Tower at the beginning of February.
With two 53 story towers, Downtown 5th will reach 495 and have a total of 1,042 rental units.
Previous construction photos of Downtown 5th can be viewed here.